Movies TV Shows Search Top Rated Movies Top Rated TV Episodes People
Genres

The Tunnel S31E25 - Roxbury; Looking Back and Looking Ahead

The Tunnel
The Tunnel
The Tunnel (2013)

S31E25 Roxbury; Looking Back and Looking Ahead

Mar 27, 2010 Season 31 Episode 25
The Tunnel S31E25

Episode Overview

As the final week in Roxbury approaches, tile contractor Angelo McRae teaches Kevin the process of installing meshed white subway tiles along with a rail cap for the kitchen backsplash. Kevin then heads to our Washington, D.C. project house to meet the family who has moved in and to see the results of our last non-profit development project. Meanwhile, general contractor Tom Silva assists lead carpenter Colin Paterson in customizing and installing the stair treads and newel post for the newly constructed stairs.